Habitat Improvement work carried out in the River Boyne and Trimblestown River 2024

On Sunday 15th of September the club organised the first of the planned work days to loosen the gravel in the river Boyne and the Trimblestown River. For stage one we met at 10.00am at Newtown bridge to carry out the first phase of the much needed habitat improvements. Overtime the gravel in the river bed starts to solidify and if left it will end up like the concrete on a road. This will make it virtually impossible for Salmon and Trout to dig Redds (Redds are the name given to the area or indent in the gravel in which the hen fish digs out to spawn) to lay their eggs in. If this is the case, what will happen is the salmon and trout will find areas where the gravel is workable and could dig out where another fish has already deposited her eggs. It is important the river has sufficient gravel areas to encourage spawning. The work we have carried out will help to ensure there is plenty of workable easy to dig gravel. But this is only a drop in the ocean, the amount of gravel that is needed to help to curb the extinction of the Atlantic Salmon is thousands of tons throughout the rivers. At a later stage I hope I will report on the success of the gravel areas and hopefully get some photographic evidence of the salmon spawning. Keep an eye out for updates on the subject.

Stage 1. Main Channel River Boyne

On Saturday 21st of September again members of the committee met to do some more on the gravel areas but this time on the Trimblestown River. Our goal was to tackle the 3 gravel areas at the Boyne end of the river. If you look at the attached you can see a massive difference in the condition. Some of these areas we have already witnessed some good spawning in previous years.

Stage 2 Trimblestown River

Comments are closed.